RELEVANT PROJECTS
Load Test Evaluation of Augspurger Ramp Parking Garage, Buffalo, NY

Two diagnostic in-situ load tests were performed on the floor system. In all load tests, the critical test section was over the intersection between beam, along alignment XB, and the joist perpendicular to it, in terms of negative moment. The structural members were loaded until the desired moment at critical sections was produced or inelastic behavior (e.g., cracking was observed).

Drilling of the Floor to Install Loading Bars Reaction Weight
Installation Sensors Load Test Setup
   

Click Here for More Information